-
Heating & Cooling
-
Baseboard Heating
-
Central Air Conditioning
-
Electronic Air Cleaner
-
Evaporative (Swamp) Cooler
-
Fireplace (gas)
-
Fireplace (wood-burning)
-
Forced Air Heating
-
Fresh Air Heat Exchanger
-
Furnace (gas)
-
Gas Furnace or Boiler
-
Geothermal Heat Pump
-
Heat Pump (traditional)
-
Hydro-Air System
-
Oil Furnace or Boiler
-
Pellet Stove
-
Programmable Thermostat
-
Radiators
-
Room Air Conditioner
-
Water Heater (electric)
-
Water Heater (gas)
-
Water Heater (Hydro-Air)
-
Water Heater (oil)
-
Water Heater (tankless)
-
Whole House Fan
-
Whole House Humidifier
-
Wood Stove
-
-
Appliances
-
Clothes Dryer
-
Clothes Dryer (gas)
-
Dehumidifier
-
Dishwasher
-
Electric Shaver
-
Freezer (stand-alone)
-
Garbage Disposal
-
Humidifier
-
Instant Hot Dispenser
-
Microwave Oven
-
Oven (electric)
-
Oven (gas)
-
Personal Computer
-
Refrigerator/Freezer
-
Stove Cooktop (electric)
-
Stove Cooktop (gas)
-
Trash Compactor
-
Washing Machine
-
-
Structural
-
Outside
-
Automatic Sprinklers
-
Barbecue Grill (charcoal)
-
Barbecue Grill (gas)
-
Barbecue Grill (hibachi)
-
Brick Siding
-
Composter
-
Decking
-
Driveway
-
Holiday Lighting
-
Hot Tub Spa
-
Lawn & Landscaping
-
Outdoor Lighting
-
Outside Water Faucets
-
Patio Furniture
-
Pool Heater (gas)
-
Pool Heater (heat pump)
-
Pool Heater (solar)
-
Septic System
-
Swimming Pool
-
Vinyl Siding
-
Well Water
-
Wood Siding
-
-
Furnishings
-
Safety & Other
Click on the above sections to explore our Home Care Library
Marble Floors
Marble Floor Miscellaneous
The Home Wizard app calculates your
ideal home care program
to avoid
problems with your Marble Floors, but sometimes trouble
can still occur. Here are answers to
questions about marble floor miscellaneous.

QUESTION FROM Lima Chan
Some of my house's foundation beams were twisted and it pushed up the underlayment board. So I have some body put side board between the beam and post all over my house but I was told that it cannot correct the problem I have. It has to be two sister board bolted against the post. Is it right? Also, I also have him put extra posts, looks like it was not the right post. Is it right that the foundation post has to be the one with a twisted screw not cemented to the ground(I was told this kind is to be used to build the deck but not foundation) Any information will appreciated. Just to think what have done has to be redone makes me frustrated. Thank you. lima

ANSWER FROM HOME-WIZARD
Dear Lima:
Without seeing your specific situation, it difficult to say what should have been done to properly level your floor.
I would have thought that to provide adequate support that the new posts would need to be installed on top of concrete footers that would have needed to be cut, dug and poured into the ground below them. But again, it is hard to say without actually seeing your exact situation. Similarly with the sistering of the beams.
However, here is a link to a webpage about floor leveling that you might find useful: http://www.houserepairtalk.com/showthread.php?t=3099
Hope this is helpful.
Home-Wizard.com
Marble Floors

Loading ...
